Key Statistics
Project Details
Plant Owner
        MITT Corporation Company Limited
Plant Developer
        Tokyo Sangyo Company Limited / TW. Tech 1711 Co. Ltd
Plant Details
        50 tons/hr Refused Derived Fuel (RDF) Fired Boiler Plant
Plant Objective
        To export power to the main power grid
Plant Location
                Saraburi Province, Central Thailand 110 km from Bangkok
Requirements
      Internal Turbine Consumption: 50 tons/hr
Steam Condition: 54 bar(g), 450°C
Harnessing energy from waste to create a cleaner world for the generations to come.


 
           
           
          