Key Statistics
Project Details
Project Period
1994 – 1995
Plant Owner
PT Masari Dwisepakat Fiber
Plant Details
6.0MW 35 tons/hr boiler at 37 barg, 435°C with travelling grate, fully condensing turbine with power export to MDF plant.
Plant Objective
To generate 6.0MW nett Electricity output using wood waste from wood board industry (MDF) plant and coal from external source.
Plant Location
Karawang, West Java, Indonesia
Requirements
Internal Consumption : 700 kW
Power For Production : 5,300 kW
Power Required : 6,000 kW