Key Statistics
Project Details
Project Period
2002 – 2004
Plant Owner
Felda Palm Industries Sdn Bhd
Plant Details
7.5MW 50 tons/hr Palm Oil Waste Combined Heat and Power (CHP) Fired Power Plant and 16 metric tonnes/hr extracted steam at 14 bar.
Plant Objective
To generate 6.0MW nett Electricity output using Palm oil waste and simultaneously to supply steam at 14 barg for a flow volume of 16 metric tonnes per hour to refinery.
Plant Location
Felda Sahabat Complex, Off Lahad Datu, Sabah, Malaysia
Requirements
Sahabat Kernel Crushing Plant (SKCP): 2,400 kW
Sahabat Oil Product (SOP): 1,800 kW
Domestic: 1,500 kW
Buffer: 300 kW
Power For Production: 1,500 kW
Power Required: 7,500 kW
Awards
8th Asean Renewable Energy Project Competition 2009
Cogeneration Category - Felda Palm Industries Sdn Bhd