6.0 MW Wood Waste Fired Power Plant in Sabah

Key Statistics

Project Details

Project Period

1996 – 1998

Plant Owner

Parakaya Plywood Sdn Bhd

Plant Details

6.0MW 50 tons/hr boiler for Wood Waste Fired Power Plant at 37 barg, 435°C with travelling grate, fully condensing turbine.

Plant Objective

To generate 6.0MW nett Electricity output using wood waste and simultaneously export power to neighbouring plywood mill.

Plant Location

Keningau, Sabah, East Malaysia

Requirements

Internal Consumption: 700 kW
Power For Production: 5,300 kW
Power Required: 6,000 kW