Key Statistics
Project Details
Project Period
2011 - 2013
Plant Owner
FTJ Bio Power Sdn Bhd
Plant Details
Empty Fruit Bunch Waste Fired Power Plant complete with 12.5MW Steam Turbine Generator and 60 tons/hr Boiler.
Plant Objective
To generate 10MW nett electricity output for export to the Grid.
Plant Location
Felda Jengka 9, Pahang, Malaysia
Requirements
Internal Consumption: 2,500 kW
Power to be Sold to Grid: 10,000 kW
Power Required: 12,500 kW